Some actions can only have a consecutive action. It is shown in a single and one-way path from that action to the next.
Other times, multiple paths can be branched off from a single action. It is indicated by multiple lines running from the action’s icon to each of its successive actions. In some cases, such paths have their own labels.
Contact
0216 456 02 76
info@netoloji.com
Address
Turkey: Dudullu OSB Mah, Des-2 Cad. Teknopark Binası Apt. No: 8/66 34776 İstanbul
USA: 4 Heather Ct. 60490 Bolingbrook Illinois Chicago
LATAM: Carrera 27 Nro. 20 Sur – 121 Medellin Colombia